San Jose
City
San Jose
Sq Ft
246,294
Project Type
Featured Projects, Education/POW/Non-Profit
This multi-faceted project consisted of the Valley Christian High School Gym and Education Buildings, which included a 125,000-square-foot, four-story structural steel education building and 60,000-square-foot two-story gymnasium. The High School consisted of a 6,794-square-foot, three-story building with weight room and classrooms. This was a new construction and interior build out with site work.
The expansive project also included the Valley Christian High School Football Stadium and Field, which was a 12,000-square-foot two-story building with detached public restrooms, two locker rooms, offices, two weight rooms, a concession stand, a 3,000-seat bleacher system above the building and a 500-square-foot VIP/Press box above bleachers. A functional field turf football field with eight lane rubberized track was also added.
SBC also designed and constructed the Valley Christian High School Baseball Stadium and Field, a 10,000-square-foot concrete, masonry, and steel building with a classroom, public restrooms, two locker rooms, offices, press box, concession stand, a 650-seat bleacher system, a 2,000-square-foot viewing deck, field turf baseball field dug-outs, batting cages, and an 800-seat poured-in-place colored concrete amphitheater.
The project also included Valley Christian Elementary School, a 30,000-square-foot, two-story education building and site work which included grass fields, parking lot, landscaping and sidewalks.
Their new four story, 55,000-square-foot Arts Conservatory building was the latest addition which we completed in 2011.